Final Project Report: C-43 Direct Measurements of Denitrification Rates in Wetland Mesocosms: A Comparison of Removal Rates of Biologically Available Nitrogen between Vegetation and Hydraulic Loading Rates Treatments, UMCES, 2019 |
|
application/pdf |
4.16 MB |
Final Project Report, In-Depth Data Analysis and Integration of C-43 Water Quality Treatment and Testing Project: Phase I Bioassays and Mesocosms, South Florida Engineering and Consulting, LLC and Coastal Ecosystems, LLC 2020 |
|
application/pdf |
1.46 MB |
Final Project Report (Main Report and Appendices A-C), C-43 Water Quality Treatment and Testing Project – Phase I, J-Tech, Wetland Solutions, Inc. 2019 |
|
application/pdf |
111.17 MB |
Final Project Report (Attachment - Nitrogen Budgets), In-Depth Data Analysis and Integration of C-43 Water Quality Treatment and Testing Project: Phase I Bioassays and Mesocosms, South Florida Engineering and Consulting, LLC and Coastal Ecosystems, 2020 |
|
application/vnd.openxmlformats-officedocument.spreadsheetml.sheet |
76.66 KB |
Final Project Report (Appendices D-Q), C-43 Water Quality Treatment and Testing Project – Phase I, J-Tech, Wetland Solutions, Inc. 2019 |
|
application/pdf |
182.77 MB |
C-43 Constructed Wetlands for Pollution Control, IWA Specialist Group, 2000 |
|
application/pdf |
3.94 MB |