Water Budget Analysis for Stormwater Treatment Area 6, Section 1 (May 1, 2005 through April 30, 2007) |
|
application/pdf |
2.41 MB |
Water Budget Analysis for Stormwater Treatment Area 5 (May 1, 2006 - April 30, 2007) |
|
application/pdf |
917.9 KB |
Water Budget Analysis for Stormwater Treatment Area 2 (May 1, 2006 - April 30, 2007) |
|
application/pdf |
842.36 KB |
Vegetation Mapping (1998-2006) and Field Surveys (1995-2006) in the Everglades Agricultural Area Stormwater Treatment Areas |
|
application/pdf |
15.63 MB |
Synopsis of the Everglades Stormwater Treatment Areas, Water Year 1996-2012 (ASB-WQTT-12-001) |
|
application/pdf |
5.05 MB |
Supporting Information for Canal Evaluations |
|
application/pdf |
5.23 MB |
Stormwater Treatment Area Water and Phosphorus Budget Improvements - Phase I: STA 3/4 Cells 3A and 3B Water Budgets |
|
application/pdf |
2.4 MB |
Stormwater Treatment Area 1 West Discharge Canal Evaluation Report |
|
application/pdf |
530.64 KB |
STA-3/4 Periphyton-based Stormwater Treatment Area (PSTA) Cell Water and Total Phosphorus Budget Analyses |
|
application/pdf |
1.1 MB |
STA-1 Inflow Basin Canal Investigation Phase I Report |
|
application/pdf |
5.47 MB |
Phosphorus Flux in the Taylor Creek Stormwater Treatment Area: Potential Causes and Recommeded Control Strategies |
|
application/pdf |
2.18 MB |
Phase I Summary Report for the Use of Soil Amendments/Management to Control P Flux Study |
|
application/pdf |
1.63 MB |
Influence of Seepage on the Stormwater Treatment Area 3/4 Periphyton-based Stormwater Treatment Area Cell’s Treatment Performance |
|
application/pdf |
4.13 MB |
Everglades Stormwater Treatment Area Average Ground Elevations, Stage-Area/Stage-Volume Relationships and Effective Treatment Areas (ASB-WQTT-12-002) |
|
application/pdf |
5.06 MB |
Evaluation of the Design, Operation and Treatment Performance of Periphyton Stormwater Treatment Area (PSTA) Platforms |
|
application/pdf |
1.54 MB |
Evaluation of Remote Phosphorus Analyzer Measurements and Hydrologic Conditions of the STA-3/4 Periphyton-based Stormwater Treatment Area |
|
application/pdf |
532.08 KB |
Effects of Vegetation Management Strategies on the Establishment of Submerged Aquatic Vegetation in Cell 5B of Stormwater Treatment Area 1 West (STA1W) |
|
application/pdf |
9.4 MB |
Effects of Pulse Flow Events on the STA-3/4 PSTA Cell's Phosphorus Treatment Performance |
|
application/pdf |
1.81 MB |
Comparison of Outflow Total Phosphorus Concentrations from the Everglades Stormwater Treatment Areas Calculated with Autosampler vs. Grab Sample Data |
|
application/pdf |
883.33 KB |
Below the Surface: Everglades Stormwater Treatment Areas |
|
application/pdf |
7.39 MB |
Baseline Soil Characterization for Compartment B in Stormwater Treatment Area 2 and Compartment C in Stormwater Treatment Area 5/6 |
|
application/pdf |
1.05 MB |
Antecedent Land Use of the Everglades Stormwater Treatment Areas |
|
application/pdf |
6.75 MB |
Annual and Period-of-Record Total Nitrogen Reduction in the Everglades Stormwater Treatment Areas |
|
application/pdf |
493.07 KB |
Analysis of Effects of Sustained Moderate Flow at the Stormwater Treatment Area 3/4 Periphyton-based Stormwater Treatment Area |
|
application/pdf |
673.04 KB |
A-1 Flow Equalization Basin Seepage Study |
|
application/pdf |
4.43 MB |
2012 Updated Everglades Stormwater Treatment Area Average Ground Elevations, Stage-Area/Stage-Volume Relationships and Effective Treatment Areas |
|
application/pdf |
5.16 MB |